The 95% completed Contract documents were delivered to the Owner, the Georgia Department of Education and TQ Constructors (CM).  The demolition of the existing “Oxford manufacturing building “ is underway.  The Construction Manager (CM) is expected to deliver the “GMP” (Guaranteed Maximum Price) on or before July 20th, 2016.  Recycling of the concrete, brick, and some steel is also underway, with an eye on cost savings and sustainability.