This project included a remodeling and addition to the existing 1980 Circa Field House. The gymnasium floor was replaced along with the football stadium sewer system and the softball stadium dugouts. The existing bleacher systems were refurbished, and 8 tennis courts were added. Lastly, the cooling tower was replaced, and the current paving conditions were improved.