Description

The 36,428 sq. ft. Fine Arts Facility was a new addition at the High School. Completed in 2003, the Auditorium seats 1,013 on a single floor. It is fully equipped with sound and lighting system with the control room housed on the second floor.

Services Performed by the Firm

Full architectural, plumbing and electrical engineering, lighting and sound systems, and interior design.