Patterson Elementary School

Patterson Elementary is an¬†existing school campus designed in 1980 by another firm respectively with SPDG completing additions in 1995 and 1999. This project consisted of 3,800 square feet of additions and 53,264 square feet of renovated/modified space. Upgrades included new floor coverings, paint, ornamental ceilings, restroom additions and modifications, new millwork, HVAC in the gym…

Heard Elementary School

The Heard Elementary School district lies in the southern portion of Bibb County. The physical heart of the community, the town square, is located at the intersection of Houston Road and Vinson Road where three community buildings are found: Heard Elementary School, Charles A Lanford, M.D. Library and Liberty United Methodist Church. The existing Heard…

Barrow Elementary School

This project consisted of the renovation of the Historic Barrow Elementary School, which is located downtown adjacent to the University of Georgia Campus. The school has strong community involvement and a tremendous support system. The goal for the project was to bring the facilities up to the latest educational facility. The site required some outside…

H. T. Edwards Learning Center

Phase I of this project consisted of two new buildings on an existing campus. The two buildings contained the Early Childhood Education and the SOAR-Alternative Education programs. The Early Childhood building was a conventional steel frame structure with metal stud walls and brick veneer. The SOAR building was a two-story brick veneer and concrete block…

Multi-Purpose Building, Pierce County High School

This project included a remodeling and addition to the existing 1980 Circa Field House. The gymnasium floor was replaced along with the football stadium sewer system and the softball stadium dugouts. The existing bleacher systems were refurbished, and 8 tennis courts were added. Lastly, the cooling tower was replaced, and the current paving conditions were…

Midway Elementary School

This elementary school serves grades K-3¬†and contains twenty-six new classrooms, an administrative suite, kitchen, cafeteria, media center, 3 special needs classrooms as well as art, music and computer classrooms. There is also a unique multi-purpose area used for physical education and assembly. This project utilizes high performance construction materials such as polished concrete floors, carpet…